Quality, safety, financials, tendering, plant & fleet, governance, and field operations — 18 modules pre-loaded with Australian standards. Used by solo operators through to Tier 1 head contractors across earthworks, drilling, pavement, stabilising, spray seal, asphalt, mining services, landscaping and more.
9
State Specs
1,313
ITP Items
27
Calculators
18
Modules
AU
Hosted Region

Austroads Compliant
All state specs included
Plays nicely with the tools you already use
Vendor names & marks property of their respective owners. Stockpile PM is independent and not affiliated.
Built For
Modular pricing + role-based access means the same platform fits a one-truck operator and a 200-person principal contractor. Configurable disciplines mean it doesn't matter what you do — if it's civil, it's here.
Owner-Operators
Solo subbies & contractors
1–5 users
Small Crews
Established subbies
5–20 users
Mid-Tier
Multi-project specialists
20–80 users
Tier 1 / 2
Principal contractors
80+ users
Disciplines we cover
Don't see yours? Every module is configurable — ITP libraries, cost codes, dockets and templates all flex to your specialisation.
Everything You Need
Grouped the way a contractor thinks about a job — bid it, run it, prove it, resource it. Every module designed around Australian civil workflows, not retrofitted from commercial construction.
Estimate, tender and chase contract notices.
Pipeline CRM, 5-tab estimating workflow, rate library, cost build-ups, program scheduling, overheads calculator, and key personnel database. Export to Excel or Word.
Pipeline CRM + estimating
Register exports with column picker, quick report templates, Excel and PDF generation with company letterhead. Pick your columns, set your filters, export.
Column picker exports
Contract notice generation for EOTs, RFIs, variations, and general notices. Auto-draft weather delay EOTs using live Bureau of Meteorology data.
Auto weather EOTs
Day-to-day delivery — programme, dockets, sign-on.
From first quote to final invoice, see exactly where every job stands. Smart alerts, project cards, and financial overview at a glance.
Real-time project dashboards
Daily diaries with custom templates, prestart checklists, multi-row dockets (concrete, asphalt, spray seal, drilling, pipe, traffic, survey set-out), fuel logs, earthworks tracking, and dayworks sheets that pull from your contract's pre-agreed rates.
8+ docket types
Interactive Gantt chart auto-generated from your BOQ. Linked to project calendar, drives financial forecast, and shows critical path at a glance.
Auto-generated Gantt
GPS-stamped QR sign-on at every site. Supervisor map view shows everyone currently on site, where they signed on, and who hasn't signed off. Auto-refreshes every minute.
Live GPS sign-on map
ITPs, SWMS, governance, training and audit-ready compliance evidence.
Pre-loaded with 1,313 inspection items from Australian road authorities. Digital sign-offs, automatic NCR tracking, ITP checklists, and compliant lot certificates.
1,313+ pre-built ITP items
Safety audits, SWMS with batch signing, incident reporting (including Notifiable Incident workflow), induction tracking, Toolbox Talks with attendee signatures, configurable Permit-to-Work signoff chains, Subcontractor Pre-Qualification with smart alerts, and environmental management.
AU compliance built-in
Project governance plans (PGP), project quality plans (PQP), competency matrices, subcontractor QA management, and compliance engine — all audit-ready.
PGP + PQP templates
Training Logbook tracks plant operating hours per worker per machine category. Auto-calculates competency status, integrates with eLearning course library, and logs CPD hours for Engineers Australia / RPEQ.
Auto competency tracking
Per-machine logbooks for hours, km, fuel and defects, backed by prestart inspections, maintenance history and operator competencies. Builds the audit-ready evidence trail that helps you win certifications and pass client and agency audits.
Audit-ready records
AES-256 encryption at rest, TLS 1.2+ in transit, AU data residency (Melbourne region), per-tenant isolation, configurable MFA, full audit trail on financial mutations. Inherits SOC 2 / ISO 27001 from Google Cloud.
AU-hosted, audit-ready
Plant, fleet, financials, client portal and group rollups.
BOQ tracking, progress claims, variations, purchase orders, rise & fall adjustments, cashflow forecasting with S-curve, and daily cost tracking.
Live S-curve forecasting
Comprehensive prestarts, defect register, breakdowns, maintenance scheduling + dossier per machine, fuel management with fleet cards (Fleetcard, WEX), parts registry, invoices, own-vs-hire cost engine, and a telematics marketplace (GoFar, Fleetio, OEM).
Full fleet lifecycle
Role-gated client views with configurable access, digital sign-offs, notice acknowledgements, and a multi-step approval workflow engine with signature capture.
Client sign-off portal
Manage multiple companies under one login. Group dashboard with cross-entity reporting, shared resources, and centralised administration.
Group-level oversight
Log machine hours, track utilisation rates across your fleet, generate summary reports with progress bars, and export to CSV for further analysis.
Fleet utilisation rates
See It In Action
One platform manages your entire project lifecycle. Here's what each stage looks like inside Stockpile PM.

Smart alerts, yard tasks, project cards, and portfolio summary — everything at a glance

Full BOQ register with auto/manual claiming, previous quantities, and remaining balance tracking

Critical path scheduling with site days, contract days, daily cost tracking, and dependency chains

Lot register with ITP checklists, QR codes, NCR tracking, and full traceability panel

Earthworks cost build-ups with resource loading, OH+M calculations, and spread templates
How It Works
One platform that follows your entire project lifecycle.
Receive tender documents, review specifications, and assess requirements using built-in state standards.
Build estimates with the 5-tab workflow, rate library, and overhead calculations. Submit competitive bids faster.
Award the job — BOQ, programme, and plant allocations flow automatically. Track costs, schedule resources, manage quality.
Execute inspections using pre-loaded ITPs, capture digital signatures, track NCRs, and generate lot certificates.
Submit progress claims, track variations, manage purchase orders, and get paid faster with complete audit trails.
Specifications
Pre-loaded inspection items and test requirements from every Australian state road authority — plus national Austroads guidance.
Austroads
National pavement design + AGPT guides
Coverage spans road authority test schedules, ITPs, conformance regimes and pavement design references for every state and territory.
Simple Pricing
Client and viewer accounts are always free. Contact us for a personalised demo.
Foundation Customer Pricing — sign up before 30 June 2026
The prices below are FY2025-2026 rates. Sign up before 30 June 2026 as a Foundation Customer and your plan stays at these rates for two full years — locked until 30 June 2028. From 1 July 2026 all new subscriptions start on the FY2026-2027 schedule (~30% higher, shown beside each plan).
*Scale plan saving vs FY2026-27 rate × 24 months. Smaller plans save proportionally.
For small crews getting organised
FY2025-26 rate
From 1 Jul 2026: $259/mo+30%
🔒 Foundation Customer — locked until 30 Jun 2028
For growing teams winning more work
FY2025-26 rate
From 1 Jul 2026: $545/mo+30%
🔒 Foundation Customer — locked until 30 Jun 2028
For established contractors running multiple projects
FY2025-26 rate
From 1 Jul 2026: $999/mo+30%
🔒 Foundation Customer — locked until 30 Jun 2028
For large operations needing custom solutions
All prices in AUD + GST. Contact us for a personalised walkthrough.
Stockpile PM is designed by civil construction professionals who understand what it takes to win work, deliver projects, and get paid.
Pre-loaded with specifications from all 8 state road authorities plus Austroads. No configuration needed — start inspecting on day one.
Not a generic PM tool with construction bolt-ons. Every workflow, every field, every calculation is designed for roads, earthworks, and infrastructure.
From a 5-person crew running 3 jobs to a 25+ team across multiple projects — Stockpile PM scales with your business without needing a new platform.
Customer testimonials coming soon. Early access users are testing Stockpile PM on live projects across Queensland and New South Wales.
Want to be featured? Email sales@stockpilepm.com.au
Get In Touch
Fill in the form below or email us directly at sales@stockpilepm.com.au
Get a personalised demo for your team. See how Stockpile PM fits your projects.
Contact Us for a Demo